AKRON ROAD over NORTHWEST DRAIN OUTLET 1
SEC 32 WISNER TWP · County 157, Michigan · Built 1924 · 2 Lanes · 80 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.565586, -83.682647
This bridge is in worse condition than 74.3% of bridges in County 157. The average bridge in Michigan is 0 years old; this one is 102 years old.
Nearby Bridges
VAN BUREN ROAD over VCCM&S DRAIN
Built 2007
OLD STATE ROAD over NORTHWEST DRAIN OUTLET 1
Built 2010
OLD STATE ROAD over QUANICASSEE RIVER CUT
Built 2016
DON ROAD over GIBSON DRAIN
Built 1965
DUTCHER ROAD over VCCM&S DRAIN
Built 1980
QUANICASSEE ROAD over NORTHWEST DRAIN OUTLET 2
Built 1994
M-25 over QUANICASSEE RIVER
Built 2013
DUTCHER ROAD over NORTHWEST DRAIN OUTLET 1
Built 1970
QUANICASSEE ROAD over NORTHWEST DRAIN OUTLET 1
Built 1980
DARBEE ROAD over VCCM&S DRAIN
Built 1962
Bridge Details
- Structure #
- 000000000010667
- Year Built
- 1924
- Reconstructed
- 1977
- Length
- 15.5 m (50.9 ft)
- Max Span
- 14.2 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 80
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $235,000
- Total Project Cost
- $340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.