GARNER ROAD over NORTHWEST DRAIN OUTLET 2

SEC 1-2 GILFORD TWP · County 157, Michigan · Built 1962 · 2 Lanes · 110 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000010608
Year Built
1962
Length
8.5 m (27.9 ft)
Max Span
8.1 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
110
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.