BAY PARK ROAD over AKRON CENTERLINE DRAIN
SEC 3-32 AKRON · County 157, Michigan · Built 1972 · 2 Lanes · 412 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
43.653169, -83.52605
This bridge is in worse condition than 74.3% of bridges in County 157. The average bridge in Michigan is 0 years old; this one is 54 years old.
Nearby Bridges
M-25 over AKRON DRAIN
Built 1985
BAY PARK ROAD over WALKER-HAYES DRAIN
Built 1972
LOOMIS ROAD over AKRON CENTERLINE DRAIN
Built 1993
LOOMIS ROAD over WALKER-HAYES DRAIN
Built 1958
LOOMIS ROAD over TUTTLEVILLE DRAIN
Built 1980
RINGLE ROAD over SELLARS DRAIN
Built 1960
BAY PARK ROAD over ALLEN DRAIN
Built 1972
ALLEN ROAD over ALLEN DRAIN
Built 1980
LOOMIS ROAD over ALLEN DRAIN
Built 1999
THOMAS ROAD over SELLARS DRAIN
Built 1960
Bridge Details
- Structure #
- 000000000010484
- Year Built
- 1972
- Length
- 6.1 m (20 ft)
- Max Span
- 4.9 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 412
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $26,000
- Total Project Cost
- $170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.