BIRCH RUN ROAD over THETFORD-ARBELA I/C DRN

SEC 23-26 ARBELA TWP · County 157, Michigan · Built 1978 · 2 Lanes · 3,540 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000010450
Year Built
1978
Length
10.4 m (34.1 ft)
Max Span
9.9 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,540
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.