M-25 over ALLEN DRAIN

7.5 MI NE OF BAY COL · County 157, Michigan · Built 1985 · 2 Lanes · 5,571 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000010442
Year Built
1985
Length
11.5 m (37.7 ft)
Max Span
11.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,571
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.