M-25 over MILWAUKEE CREEK

IN LAKEPORT · County 147, Michigan · Built 1986 · 2 Lanes · 8,420 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000009960
Year Built
1986
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
8,420
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.