M-19 over SULLIVAN DRAIN

1.7 MI N OF M-21 · County 147, Michigan · Built 1987 · 2 Lanes · 3,977 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000009901
Year Built
1987
Length
12.8 m (42 ft)
Max Span
12 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
3,977
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.