PALDI ROAD over SPEAKER-MAPLE VALLEY DRN
SEC 21 ELK TWP · County 151, Michigan · Built 1969 · 2 Lanes · 200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.279628, -82.838492
This bridge is in worse condition than 59.4% of bridges in County 151. The average bridge in Michigan is 0 years old; this one is 57 years old.
Nearby Bridges
HARRINGTON ROAD over SPEAKER-MAPLE VALLEY DRN
Built 1960
CARROLL ROAD over ELK CREEK DRAIN
Built 1991
PALDI ROAD over ELK CREEK DRAIN
Built 1950
HARRINGTON ROAD over ELK CREEK DRAIN
Built 1991
STILSON ROAD over MCDONALD DRAIN
Built 1950
STILSON ROAD over ELK CREEK DRAIN
Built 1978
STILSON ROAD over MCDONALD DRAIN
Built 1981
MELVIN ROAD over ELK CREEK DRAIN
Built 1930
MELVIN RD over MC DONALD DRAIN
Built 2018
PECK ROAD over ELK CREEK DRAIN
Built 2023
Bridge Details
- Structure #
- 000000000009600
- Year Built
- 1969
- Length
- 10.2 m (33.5 ft)
- Max Span
- 9.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $226,000
- Total Project Cost
- $275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.