PALDI ROAD over SPEAKER-MAPLE VALLEY DRN

SEC 21 ELK TWP · County 151, Michigan · Built 1969 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000009600
Year Built
1969
Length
10.2 m (33.5 ft)
Max Span
9.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$226,000
Total Project Cost
$275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.