M-90 over BLACK RIVER

4.7 MI W US-25 IN CROSWEL · County 151, Michigan · Built 2023 · 2 Lanes · 8,400 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000009459
Year Built
2023
Length
63.7 m (209 ft)
Max Span
21.9 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
8,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$991,000
Total Project Cost
$169,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.