SCHULTZ RD over WHITMORE DRAIN
0.1 MI N OF PANGBORN ROAD · County 145, Michigan · Built 1910 · 2 Lanes · 10 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 2 | Critical |
Location
43.472406, -84.20075
This bridge is in worse condition than 98.7% of bridges in County 145. The average bridge in Michigan is 0 years old; this one is 116 years old.
Nearby Bridges
RAUCHOLZ ROAD over WHITMORE DRAIN
Built 2005
FORDNEY ROAD over WHITMORE DRAIN
Built 2008
DICE ROAD over WHITMORE DRAIN
Built 2003
TITTABAWASSEE ROAD over WHITMORE DRAIN
Built 1932
SCHREIBER ROAD over WEEKS DRAIN
Built 1930
TITTABAWASSEE ROAD over WEEKS DRAIN
Built 1980
SMITHS CROSSING RD over WEEKS DRAIN
Built 1994
FEHN ROAD over WEEKS DRAIN
Built 1991
FEHN ROAD over WHITMORE DRAIN
Built 2004
HEMLOCK ROAD over WEEKS DRAIN
Built 1956
Bridge Details
- Structure #
- 000000000009396
- Year Built
- 1910
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.5 m
- Width
- 5.2 m (17.1 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $350,000
- Total Project Cost
- $560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.