HEMLOCK ROAD over SOUTH BRANCH BAD RIVER
0.5 MI N OF MARION ROAD · County 145, Michigan · Built 1954 · 2 Lanes · 2,529 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 7 | Good |
Location
43.252261, -84.229125
This bridge is in worse condition than 21% of bridges in County 145. The average bridge in Michigan is 0 years old; this one is 72 years old.
Nearby Bridges
HEMLOCK ROAD over BIG POTATO CREEK
Built 1956
RING ROAD over BIG POTATO CREEK
Built 2001
BRENNAN ROAD over SOUTH BRANCH BAD RIVER
Built 1898
BRANT ROAD over SOUTH BRANCH BAD RIVER
Built 2008
RAUCHOLZ ROAD over BIG POTATO CREEK
Built 1959
BRENNAN ROAD over BIG POTATO CREEK
Built 1973
BURT ROAD over LAMB CREEK
Built 1983
FOWLER ROAD over LITTLE POTATO CREEK
Built 1986
BURT ROAD over SOUTH BRANCH BAD RIVER
Built 1973
STEVENS ROAD over BIG POTATO CREEK
Built 1920
Bridge Details
- Structure #
- 000000000009238
- Year Built
- 1954
- Reconstructed
- 2023
- Length
- 36.6 m (120.1 ft)
- Max Span
- 13.6 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,529
- Material
- Steel
- Design
- Box Beam or Girders - Single or Spread
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $849,000
- Total Project Cost
- $1,011,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.