US-31 SB over PIGEON RIVER

4.4 MI SE OF M-45 · County 139, Michigan · Built 1958 · 2 Lanes · 11,630 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000008692
Year Built
1958
Length
16.7 m (54.8 ft)
Max Span
16.7 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
11,630
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.