ALEXANDER RD over I-75 SB
2.3 MI SW CHEBOYGAN COL · County 137, Michigan · Built 1962 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
45.171092, -84.645758
This bridge is in worse condition than 44% of bridges in County 137. The average bridge in Michigan is 0 years old; this one is 64 years old.
Nearby Bridges
ALEXANDER RD over I-75 NB
Built 1962
MILL ST over I-75 NB
Built 1962
MAIN ST over I-75 NB
Built 1962
OLD VANDERBILT RD over STURGEON RIVER
Built 1989
WINTERS RD over I-75 NB
Built 1962
WINTERS RD over I-75 SB
Built 1962
TROWBRIDGE ROAD over STURGEON RIVER
Built 1977
I-75 NB over STURGEON RIVER
Built 1962
I-75 SB over STURGEON RIVER
Built 1962
I-75 NB over TROWBRIDGE RD
Built 1962
Bridge Details
- Structure #
- 000000000008684
- Year Built
- 1962
- Length
- 50.6 m (166 ft)
- Max Span
- 21.8 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $108,000
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.