I-75 NB over M-32|W MAIN ST

IN GAYLORD (OVER M-32) · County 137, Michigan · Built 1961 · 2 Lanes · 6,791 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000008678
Year Built
1961
Reconstructed
1980
Length
40.5 m (132.9 ft)
Max Span
19.5 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
6,791
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.