M-33 over W BR RIFLE RIVER

1.5 MI S OF M-55 · County 129, Michigan · Built 1985 · 2 Lanes · 3,091 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000008436
Year Built
1985
Length
43.5 m (142.7 ft)
Max Span
15.5 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
3,091
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.