US-31 NB over N BRANCH PENTWATER RIVER

1.5 MI EAST OF PENTWATER · County 127, Michigan · Built 1980 · 3 Lanes · 4,413 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000008337
Year Built
1980
Length
169.5 m (556.1 ft)
Max Span
75 m
Width
14.1 m (46.3 ft)
Lanes
3
Daily Traffic
4,413
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$646,000
Total Project Cost
$380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.