GILLESPIE AVE over CLINTON RIVER

1/2 MI SW ORCH LK & BL 75 · County 125, Michigan · Built 1936 · 2 Lanes · 500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000008252
Year Built
1936
Length
10.3 m (33.8 ft)
Max Span
10 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$57,000
Total Project Cost
$58,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.