WARNER STREET over GREEN LAKE CANAL
NORTH OF COMMERCE · County 125, Michigan · Built 1961 · 1 Lanes · 200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.597256, -83.423764
This bridge is in worse condition than 83.6% of bridges in County 125. The average bridge in Michigan is 0 years old; this one is 65 years old.
Nearby Bridges
LAKE CREST DRIVE over ROSEWOOD LAKE CANAL
Built 1998
COOLEY LAKE ROAD over CLINTON RIVER
Built 1994
MARTIN PARKWAY over WETLANDS
Built 2011
SOUTH COMMERCE RD over HAYES CREEK
Built 1993
FARR STREET over HURON RIVER
Built 2024
COOLEY LAKE ROAD over HURON RIVER
Built 2023
SPRUCE DR over TRIB TO HURON RIVER
Built 1994
ELIZABETH LAKE RD over CLINTON RIVER
Built 1986
GOLDEN LANE over UNKNOWN CHANNEL
Built 1997
OXBOW LAKE ROAD over CLINTON RIVER
Built 2007
Bridge Details
- Structure #
- 000000000008214
- Year Built
- 1961
- Length
- 14.3 m (46.9 ft)
- Max Span
- 13.1 m
- Width
- 3.6 m (11.8 ft)
- Lanes
- 1
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $118,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.