I-75 SB over M-150 (ROCHESTER RD.)

IN TROY · County 125, Michigan · Built 2020 · 5 Lanes · 79,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000008065
Year Built
2020
Length
57.4 m (188.3 ft)
Max Span
28.7 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
79,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.