CORNELL RD over M-39

IN SOUTHFIELD · County 125, Michigan · Built 1963 · 3 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

42.451286, -83.220053

This bridge is in worse condition than 54% of bridges in County 125. The average bridge in Michigan is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
000000000007994
Year Built
1963
Reconstructed
2000
Length
33.1 m (108.6 ft)
Max Span
16.5 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
1,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$151,000
Total Project Cost
$77,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.