I-75 BL NB over GTW RR

S LTS OF PONTIAC · County 125, Michigan · Built 1966 · 3 Lanes · 37,709 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000007982
Year Built
1966
Reconstructed
2004
Length
71.8 m (235.6 ft)
Max Span
23.8 m
Width
14.8 m (48.6 ft)
Lanes
3
Daily Traffic
37,709
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.