SHEVLIN DBL U TURN over I-75

IN HAZEL PARK · County 125, Michigan · Built 2021 · 2 Lanes · 11,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000007965
Year Built
2021
Length
71 m (232.9 ft)
Max Span
38.6 m
Width
30.2 m (99.1 ft)
Lanes
2
Daily Traffic
11,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$280,000
Total Project Cost
$186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.