I-696 WB over ROUGE RIVER

IN SOUTHFIELD · County 125, Michigan · Built 2024 · 3 Lanes · 56,238 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

42.487431, -83.278467

This bridge is in worse condition than 25.3% of bridges in County 125. The average bridge in Michigan is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
000000000007914
Year Built
2024
Length
49.6 m (162.7 ft)
Max Span
47.9 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
56,238
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.