M-91 over FLAT RIVER

9.5 MI N OF M-57 · County 117, Michigan · Built 1994 · 2 Lanes · 7,125 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000007440
Year Built
1994
Reconstructed
2022
Length
19 m (62.3 ft)
Max Span
18.2 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
7,125
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.