PETERSBURG RD over SWAMP RAISIN DRAIN

1.25 MI S OF M-50 · County 115, Michigan · Built 1956 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000007233
Year Built
1956
Reconstructed
2019
Length
12.2 m (40 ft)
Max Span
10.6 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
500
Material
Steel
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.