I-75 SB over GTW RR

3.5 MI NE OHIO STATE LINE · County 115, Michigan · Built 2020 · 3 Lanes · 27,575 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
000000000007171
Year Built
2020
Length
40.8 m (133.9 ft)
Max Span
39.6 m
Width
19.4 m (63.6 ft)
Lanes
3
Daily Traffic
27,575
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$154,000
Total Project Cost
$67,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.