I-75 SB over MUDDY CREEK

7.7 MI NE OHIO STATE LINE · County 115, Michigan · Built 2024 · 4 Lanes · 29,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 9 Excellent
Substructure 9 Excellent

Location

41.831986, -83.428089

This bridge is in worse condition than 23.7% of bridges in County 115. The average bridge in Michigan is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
000000000007161
Year Built
2024
Length
23.2 m (76.1 ft)
Max Span
22.3 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
29,300
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.