M-30 (MERIDIAN RD) over CHIPPEWA RIVER

0.1 MI S OF CHIPPEWA R RD · County 111, Michigan · Built 1961 · 2 Lanes · 3,694 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000006951
Year Built
1961
Length
83.8 m (274.9 ft)
Max Span
16.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
3,694
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.