M-20 over CHIPPEWA RIVER

1.7 MI E OF ISABELLA COL · County 111, Michigan · Built 1940 · 5 Lanes · 14,220 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006889
Year Built
1940
Reconstructed
1996
Length
32.6 m (107 ft)
Max Span
18.2 m
Width
26.1 m (85.6 ft)
Lanes
5
Daily Traffic
14,220
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.