20TH AVE over CHIPPEWA RIVER

0.1 MI N OF 19 MILE ROAD · County 107, Michigan · Built 2018 · 2 Lanes · 160 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000006777
Year Built
2018
Length
23.2 m (76.1 ft)
Max Span
22.8 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
160
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.