28 MILE ROAD over N B CLINTON RIVER
1.3 MI WEST OF NORTH AVE · County 099, Michigan · Built 2018 · 2 Lanes · 210 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
42.7466, -82.9065
This bridge is in worse condition than 26.4% of bridges in County 099. The average bridge in Michigan is 0 years old; this one is 8 years old.
Nearby Bridges
28 MILE ROAD over OVERFLOW N B CLINTON
Built 2018
TELLER ROAD over CAMP BROOK DRAIN
Built 1979
28 MILE ROAD over TUPPER BROOK DRAIN
Built 1972
29 MILE ROAD over TUPPER BROOK
Built 1980
29 MILE ROAD over NORTH BRANCH CLINTON RIV
Built 1982
28 MILE ROAD over CAMP BROOK DRAIN
Built 1995
28 MILE ROAD over COON CREEK
Built 1969
27 MILE ROAD over TUPPER BROOK DRAIN
Built 2004
NORTH AVE over COON CREEK
Built 1978
WOLCOTT ROAD over N BRANCH CLINTON RIVER
Built 2014
Bridge Details
- Structure #
- 000000000006370
- Year Built
- 2018
- Length
- 22.9 m (75.1 ft)
- Max Span
- 22.1 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 210
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $450,000
- Total Project Cost
- $530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.