M-19 over SALT RIVER
3.3 MI SW OF ST CLAIR COL · County 099, Michigan · Built 1991 · 2 Lanes · 12,497 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.752622, -82.770056
This bridge is in worse condition than 54.9% of bridges in County 099. The average bridge in Michigan is 0 years old; this one is 35 years old.
Nearby Bridges
28 MILE ROAD over SALT RIVER
Built 2003
M-19 over SALT RIVER
Built 1991
28 MILE ROAD over KIRKHAM DRAIN
Built 2003
29 MILE ROAD over SALT RIVER
Built 1987
27 MILE ROAD over KIRKHAM DRAIN
Built 1994
CLARK over SALT RIVER
Built 2007
M-19 over SALT RIVER
Built 1991
30 MI RD over SALT RIVER
Built 1983
26 MILE ROAD over KIRKHAM DRAIN
Built 2010
26 MILE ROAD over BRANCH OF KIRKHAM DRAIN
Built 2010
Bridge Details
- Structure #
- 000000000006136
- Year Built
- 1991
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.3 m
- Width
- 15.6 m (51.2 ft)
- Lanes
- 2
- Daily Traffic
- 12,497
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $75,000
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.