BAY RD over I-75 SB

1.7 MI S OF CHIPPEWA COL · County 097, Michigan · Built 1963 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000005960
Year Built
1963
Length
48.7 m (159.8 ft)
Max Span
21.4 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
75
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.