M-134 over I-75 NB

@ M-134 · County 097, Michigan · Built 1963 · 2 Lanes · 1,404 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000005959
Year Built
1963
Reconstructed
2007
Length
47.2 m (154.9 ft)
Max Span
20.4 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
1,404
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.