PEAVY ROAD over MARION-GENOA DRAIN

SEC 2 MARION TWP · County 093, Michigan · Built 2023 · 2 Lanes · 1,595 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000005886
Year Built
2023
Length
13 m (42.7 ft)
Max Span
12.1 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,595
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.