NINE MILE ROAD over LIME KILN LAKE INLET
SEC 27-34 GREEN OAK TWP · County 093, Michigan · Built 1983 · 2 Lanes · 6,440 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
42.444186, -83.709111
This bridge is in worse condition than 60% of bridges in County 093. The average bridge in Michigan is 0 years old; this one is 43 years old.
Nearby Bridges
RUSHTON ROAD over WALKER DRAIN
Built 1995
MARSHALL ROAD over DAVIS CREEK
Built 1992
8 MILE ROAD over TOBIN DRAIN
Built 1999
DOANE ROAD over DAVIS CREEK
Built 1987
FAIRLANE ROAD over DAVIS CREEK
Built 1996
US-23 over M-36
Built 1960
WHITMORE LAKE ROAD over CN-GTC-GTW RR (ABN)
Built 1960
SILVER LAKE ROAD over DAVIS CREEK
Built 1958
RUSHTON ROAD over DAVIS CREEK
Built 1958
US-23 NB over SILVER LAKE RD
Built 1960
Bridge Details
- Structure #
- 000000000005808
- Year Built
- 1983
- Length
- 6.2 m (20.3 ft)
- Max Span
- 2.7 m
- Lanes
- 2
- Daily Traffic
- 6,440
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.