M-50 over RIVER RAISIN

IN TECUMSEH · County 091, Michigan · Built 1953 · 2 Lanes · 10,655 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005536
Year Built
1953
Length
44.2 m (145 ft)
Max Span
19.8 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
10,655
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.