M-34 over S BR RAISIN RIVER
IN ADRIAN (BEECHER ST) · County 091, Michigan · Built 1932 · 2 Lanes · 11,522 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.889261, -84.045831
This bridge is in worse condition than 91.1% of bridges in County 091. The average bridge in Michigan is 0 years old; this one is 94 years old.
Nearby Bridges
MERRICK ST over S BRANCH RAISIN RIVER
Built 1926
MICHIGAN AVENUE over S BRANCH RIVER RAISIN
Built 1949
COLLEGE AVENUE over S BRANCH RAISIN RIVER
Built 1947
US-223 BR over S BR RAISIN RIVER
Built 1934
US-223 over MDOT RR COR & M-34
Built 2006
US-223 over S BR RAISIN RIVER
Built 1953
W MAUMEE STREET over S BR RAISIN RIVER
Built 1919
MAPLE AVENUE over S BRANCH RAISIN RIVER
Built 1947
CADMUS RD over SOUTH BR RAISIN RIVER
Built 2009
US-223 over NORFOLK SOUTHERN RR
Built 1941
Bridge Details
- Structure #
- 000000000005509
- Year Built
- 1932
- Length
- 16.7 m (54.8 ft)
- Max Span
- 16.7 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 2
- Daily Traffic
- 11,522
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $79,000
- Total Project Cost
- $46,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.