M-34 over S BR RAISIN RIVER

3.2 MI E OF M-156 · County 091, Michigan · Built 1991 · 2 Lanes · 4,413 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000005507
Year Built
1991
Length
11.6 m (38.1 ft)
Max Span
10.3 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
4,413
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.