SECOND STREET over FLINT RIVER
VILLAGE OF COLUMBIAVILLE · County 087, Michigan · Built 2020 · 2 Lanes · 3,486 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.157714, -83.413633
This bridge is in worse condition than 33.1% of bridges in County 087. The average bridge in Michigan is 0 years old; this one is 6 years old.
Nearby Bridges
MARATHON ROAD over FLINT RIVER
Built 2015
MT. MORRIS ROAD over FLINT RIVER
Built 1953
NORWAY LAKE ROAD over SOUTH BR. FLINT RIVER
Built 1991
COLUMBIAVILLE ROAD over SOUTH BR. FLINT RIVER
Built 1996
BARNES LAKE ROAD over NORTH BR. FLINT RIVER
Built 1994
FLINT RIVER ROAD over SOUTH BR. FLINT RIVER
Built 1976
STANLEY ROAD over SOUTH BR. FLINT RIVER
Built 1986
CYCLONE RD over FOREST DRAIN
Built 1977
FOSTORIA RD over FOREST DRAIN
Built 1972
OAK ROAD over FLINT RIVER
Built 2007
Bridge Details
- Structure #
- 000000000005479
- Year Built
- 2020
- Length
- 36.6 m (120.1 ft)
- Max Span
- 17.8 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 3,486
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,800,000
- Total Project Cost
- $2,013,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.