WINSLOW ROAD over WESTON DRAIN EXTENSION
SEC 35-36 ATTICA TWP · County 087, Michigan · Built 1945 · 2 Lanes · 345 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.987053, -83.124353
This bridge is in worse condition than 79.8% of bridges in County 087. The average bridge in Michigan is 0 years old; this one is 81 years old.
Nearby Bridges
I-69 WB over WINSLOW RD
Built 1983
I-69 EB over WINSLOW RD
Built 1983
SUMMERS ROAD over WESTON DRAIN
Built 1992
I-69 WB over SUMMERS RD
Built 1983
I-69 EB over SUMMERS RD
Built 1983
I-69 WB over POLLY ANN TRAIL
Built 1983
I-69 EB over POLLY ANN TRAIL
Built 1983
BLACKS CORNERS RD. over WESTON DRAIN
Built 1972
I-69 EB over NEWARK RD
Built 1983
I-69 WB over NEWARK RD
Built 1983
Bridge Details
- Structure #
- 000000000005396
- Year Built
- 1945
- Length
- 6.4 m (21 ft)
- Max Span
- 6.1 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 345
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.