M-24 over N BR FLINT RIVER

0.6 MI S OF M-90 · County 087, Michigan · Built 1983 · 2 Lanes · 11,544 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000005303
Year Built
1983
Length
27.4 m (89.9 ft)
Max Span
27.4 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
11,544
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$185,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.