PACKER DRIVE over WHITE PINE TRAIL-MDNR

0.15 MI EAST OF VAN DAM · County 081, Michigan · Built 1983 · 2 Lanes · 493 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000005153
Year Built
1983
Length
43.6 m (143 ft)
Max Span
14.6 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
493
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.