M-50 over TYLER CREEK
1.3 MI W OF IONIA COL · County 081, Michigan · Built 1940 · 2 Lanes · 3,652 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.798622, -85.335333
This bridge is in worse condition than 75.2% of bridges in County 081. The average bridge in Michigan is 0 years old; this one is 86 years old.
Nearby Bridges
100TH STREET over TYLER CREEK
Built 1976
84TH STREET over PRATT LAKE DRAIN
Built 1976
84TH STREET over TYLER CREEK
Built 1927
FREEPORT AVE over DUCK CREEK
Built 1948
MONTCALM AVE over DUCK CREEK
Built 1976
FREEPORT AVE over COLDWATER RIVER
Built 1948
BAKER AVE over COLDWATER RIVER
Built 1978
WINGEIER AVE over PRATT LAKE DRAIN
Built 1966
HASTINGS ROAD over DUCK CREEK
Built 2018
EAST STREET over COLDWATER RIVER
Built 1977
Bridge Details
- Structure #
- 000000000004930
- Year Built
- 1940
- Length
- 13.7 m (44.9 ft)
- Max Span
- 13.7 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 3,652
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $46,000
- Total Project Cost
- $41,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.