EAST HIGH STREET over GRAND RIVER
600 FT N OF MICOR DRIVE · County 075, Michigan · Built 1963 · 2 Lanes · 5,328 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.227378, -84.363211
This bridge is in worse condition than 7.6% of bridges in County 075. The average bridge in Michigan is 0 years old; this one is 63 years old.
Nearby Bridges
US-127 SB over GRAND RIVER
Built 1958
US-127 NB over GRAND RIVER
Built 1958
E SOUTH ST over US-127
Built 2001
US-127 SB over MDOT RR CORRIDOR
Built 1959
US-127 NB over MDOT RR CORRIDOR
Built 1959
S MERIDIAN ROAD over GRAND RIVER
Built 1994
US-127 NB over S BR OF GRAND RIVER
Built 1959
US-127 SB over S BR OF GRAND RIVER
Built 1959
SOUTH STREET over GRAND RIVER
Built 1987
PAGE RD over US-127
Built 1958
Bridge Details
- Structure #
- 000000000004537
- Year Built
- 1963
- Reconstructed
- 2022
- Length
- 36.1 m (118.4 ft)
- Max Span
- 13.7 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 5,328
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $300,000
- Total Project Cost
- $346,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.