NOTTAWA ROAD over NORTH BR CHIPPEWA RIVER
SEC 11-12 DEERFIELD TWP · County 073, Michigan · Built 1937 · 2 Lanes · 185 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
43.616175, -84.867956
This bridge is in worse condition than 72.1% of bridges in County 073. The average bridge in Michigan is 0 years old; this one is 89 years old.
Nearby Bridges
PICKARD ROAD over NORTH BR CHIPPEWA RIVER
Built 2019
RIVER ROAD over NORTH BR CHIPPEWA RIVER
Built 2011
M-20 over N BR CHIPPEWA RIVER
Built 1934
BASELINE ROAD over NORTH BR CHIPPEWA RIVER
Built 2006
MERIDIAN ROAD over NORTH BR CHIPPEWA RIVER
Built 2018
VANDECAR ROAD over SOUTH BR CHIPPEWA RIVER
Built 1992
JORDAN ROAD over NORTH BR CHIPPEWA RIVER
Built 1971
MERIDIAN ROAD over SOUTH BR CHIPPEWA RIVER
Built 2003
NOTTAWA ROAD over NORTH BR CHIPPEWA RIVER
Built 1978
LINCOLN ROAD over CHIPPEWA RIVER
Built 2017
Bridge Details
- Structure #
- 000000000004344
- Year Built
- 1937
- Length
- 14.6 m (47.9 ft)
- Max Span
- 13.4 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 185
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $144,000
- Total Project Cost
- $207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.