NAKOMA DRIVE over RED CEDAR RIVER

0.5 M NE OF OKEMOS · County 065, Michigan · Built 1990 · 2 Lanes · 1,727 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000003908
Year Built
1990
Length
36.5 m (119.8 ft)
Max Span
18.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,727
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.