I-96 EB over I-96BL RAMPS

IN LANSING (I96 BL RAMPS) · County 065, Michigan · Built 1962 · 3 Lanes · 19,427 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000003808
Year Built
1962
Length
44.5 m (146 ft)
Max Span
11.7 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
19,427
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$70,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.