I-496 WB over GTW RR

IN EAST LANSING · County 065, Michigan · Built 2024 · 4 Lanes · 39,163 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
000000000003760
Year Built
2024
Length
27.1 m (88.9 ft)
Max Span
26.5 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
39,163
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,215,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.