FILION ROAD over E BRANCH PINNEBOG RIVER

SEC. 13-24 CHANDLER TWP. · County 063, Michigan · Built 1923 · 2 Lanes · 820 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000003522
Year Built
1923
Reconstructed
1971
Length
10.4 m (34.1 ft)
Max Span
10.2 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
820
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.